SCAFFOLD SHRINK WRAP SKILL HORIZONTAL JOINS On a typical scaffolding, the maximum drop for shrink wrap sheeting is 3 lifts (approximately 6 metres). At this point, the sheeting is secured to the scaffolding structure.